Pre-release readiness checks — on autopilot

When a Asana issue changes, the scenario checks the done-criteria, pings the team in Zulip and logs non-compliant items to oneC.

  • Every issue checked against the criteria
  • Non-compliant items land on oneC
  • The team gets pinged in Zulip
  • Problems surface before release, not after
Jira