Starting soon: events in acuityScheduling — Notes in Orbit

The scenario catches events about to start in acuityScheduling and creates notes in Orbit. Runs on its own, no manual copying.

  • By each meeting's start from acuityScheduling a note is ready in Orbit.
  • Takeaways are written from minute one.
  • The meeting's details are already in the note.
Acuity Scheduling

How it works

To create Acuity Scheduling records from Orbit without manual input, use a ready-made scenario.

  1. Starts when: Acuity Scheduling
  2. Then: Pipedrive

You can launch this Orbit + Acuity Scheduling integration in Scriptera: describe the task in plain words — the scenario is built, launched and monitored for you.